Turkey's Minister of Transport and Infrastructure Abdulkadir Uraloğlu spoke about the work being carried out regarding the Zangezur corridor.
Modern.az reports that the minister stated that the repair of the 224-kilometer road remaining on the Turkish side has already begun.
“Work on the Azerbaijani side is nearing completion. A contracting agreement has been signed for the Zangezur corridor, but construction work has not yet begun. I believe it will start in the future without much delay. There is a 180-kilometer section on the Nakhchivan side. Part of it will be repaired, and part will be rebuilt. Construction work has already begun on the 224-kilometer section on our side,” the minister said. (APA)