During the construction of the TRIPP project's railway line, the territory where the railway passed during the Soviet era will be used. The length of the line will be approximately 42 kilometers.
Modern.az reports that Armenian Deputy Prime Minister Mher Grigoryan stated this while speaking about the TRIPP project from the parliament's rostrum.
According to him, the railway will stretch along the Aras valley, and there are no privately owned land plots in this area.
“As for the highway, its specific route has not yet been finally determined. The road will pass through the southern part. It is simply necessary to conduct technical examinations because the connection area in Nakhchivan is very narrow,” the Deputy Prime Minister noted.